This forum is now closed and archived but the many helpful kiln-related topics are still available to view.
Please feel free to read through the archive or visit www.wagnermeters.com
for more detail about our wide array of moisture measurement solutions.

Author Topic: Schedule for 3+4" Doug Fir  (Read 14403 times)

Offline JakePower

  • Newbie
  • *
  • Posts: 2
    • View Profile
Schedule for 3+4" Doug Fir
« on: February 13, 2017, 12:22:48 PM »
I've been following this website for a while, but have never posted before this. I need to dry some 3-4" thick Douglas Fir in my Nyle Dehumid kilns to approx 15%. This is the schedule I am planning on working with and I am curious if anyone thinks i need to adjust this at all:

% MC   DB Temp (˚F)   WB Temp (˚F)   DEP
Above 30 %   115              96                    19
30 to 25 %   130              108            22
25 to 20 %   140              108            32
20 to 15 %   150              115            35
15 to Final %   160              115            45

Any thoughts?

Offline MichaelM

  • Forum Expert
  • Kiln Drying Enthusiest
  • *****
  • Posts: 98
    • View Profile
Re: Schedule for 3+4" Doug Fir
« Reply #1 on: February 14, 2017, 07:38:23 AM »
I would be inclined to use a 10F depression for the first few days to reduce the chance of checking.  Then at the end, use a 20-25F depression when the average MC is less than 20% to reduce the overdry and variability.  What you have will work, however.
Mike M.

 


Search


* Forum Experts

MichaelM MichaelM
Forum Expert
TimothyD TimothyD
Forum Expert
PhilM PhilM
Forum Expert
StavrosA StavrosA
Forum Expert

* Subscribe to Newsletter

* Upcoming Events

Sorry! There are no calendar events available at the moment.
\
SimplePortal 2.3.6 © 2008-2014, SimplePortal